Installation of a new building in an isolated environment while reducing on-site time.
Blais Industries stood out by introducing a different approach to prefabrication. Connection between manufacturer and conception made it possible to speed up work stages and thereby speed up on-site installation time.
Less time was wasted due to bad weather. Moreover, the complexity of mobilizing the drip equipment, thereby eliminating the risk of delay. Finally, the time spent on site was cut in half, as well as the high cost of accommodation and travel to remote sites.
BLAIS INDUSTRIES ALWAYS CHOOSE THE BEST PEOPLE TO JOIN THEIR TEAM. Are you ready to take on new challenges?
2023 © Blais Industries. All Rights Reserved. Made by CC Consultants