Move heavy equipment in and out of an operating plant without opening the roof or dismantling most of the facility.
Blais Industries stood out thanks to its experience working on several similar projects. Multiple equipment displacements can be planned by combining the overhead crane and the crane inside.
The equipment was safely removed without dismantling the roof, saving both time and money. In addition, the risk of breaking the roof membrane and slide issues have been eliminated.
BLAIS INDUSTRIES ALWAYS CHOOSE THE BEST PEOPLE TO JOIN THEIR TEAM. Are you ready to take on new challenges?
2023 © Blais Industries. All Rights Reserved. Made by CC Consultants